Generally refers to the tip of the prestressed pipe pile. It is used for the foundation construction of the prestressed concrete pipe pile and the front end of the pipe pile. It is
installed
on the pipe pile to guide and block the pipe pile when the pipe pile sinks.
Generally, in the construction of prefabricated piles, the pile tip is welded at the pile head and the pile body is brought into the soil to avoid the pile head damage and pile body tilt
(verticality control), and the pile body can enter the bearing layer well.
The form of pile tip changed and derived different shapes and specifications with different geology and use methods.
Specializing in Steel Fabrication in China since 2005, Huayang is today one of the leading Steel Fabricators. We have the capacity to take on major projects, ranging
from Oil and gas,construction,public, institution, housing, commercial to building sectors. Our in-house metal fabrication machines/ facilities include CO2 Laser
Cutting Machine, CNC Section Drilling Machine, Band Saw Cutting Machine, CNC Pipe Profile Cutting Machine, SAW welding machine and so on.
With our technology and metal workshops in our huayang factory, rest assure that our productivity and quality. We set our standard high in all our metal works in
Metal Cutting, Steel pipe buttwelding,Cutting so on. We will be able meet your requirements, and in fact, we always work beyond our clients’ expectations!